# Rollermat Sump 30 (OPEN BOX)

- Link: https://aquaticfarms.com/products/rollermat-sump-30-open-box/
- Published: 2026-10-25T14:36:33-04:00
- Author: 

**Trigger’s Custom Design For Theiling’s Rollermat**

The Rollermat Sump 30 was designed to couple directly up to the Theiling Rollermat
Filter System. Changing filter socks are now a thing of the past! This high-quality
sump is made of thick translucent blue acrylic with a clear front and black bottom
adding a stylish appeal to any system.

**Overall Dimensions without Rollermat** –** **30″ L x 16″ W x 15″ H

**Overall Dimensions with Rollermat** –** **41″ L x 16″ W x 15″ H

 * Skimmer Section – 11.75″ x 10.5″
 * Refugium Section – 15.5″ x 10.25″
 * Return Section – 6″ x 15.5″

 

**Trigger Systems Rollermat Sump 30 is changing the future of sumps!**

 * Direct Connection to the Rollermat
 * Removable Plumbing Input Plate
 * Dosing Tube Inputs
 * Integrated Probe Holder
 * Cable Organizers
 * Self Adjusting Platform
 * Laser Engraved Water Level
 * Includes Rollermat Stand

 

**RM30 Water Flow**

The drain plumbing from your tank can be plumbed directly into the 1″ PVC fittings
that are attached to the removable drain plate. Water will then automatically feed
into the Rollermat housing to be filtered. When the water level rises in the Rollermat
it will then drain into sumps first section. 

**Skimmer Section **(11.75″ x 10.5″) – This section was designed to house most space
saving style skimmers to fractionate the water as it comes out of the Rollermat.
Water then will flow over a baffle into the next chamber.

 **Refugium Section **(15.5″ x 10.25″) – This space is most commonly used for a 
refugium to grow macro algae and hold rock or sand for additional surface area. 
The top brace has a relief cut allowing it to accept most clamp-on or gooseneck 
style mounts. 

**Return Pump Section **(6″ x 15.5″) – After the baffle, your aquarium’s water will
remain in the return pump chamber and just add your favorite return pump to finish
the cycle. 

 

**Overall Dimension with Rollermat** – 40.5″ L x 16″ W x 15″ H

**Overall Dimension without Rollermat** – 30″ L x 16″ W x 15″ H

**Max Flow Rate through Rollermat** – 600 GPH

**Drain Input Size** – (3x) 1″ PVC Couplers

 

**Removable Drain Plate**

Water enters into the sump through a removable drain plate that comes with 1″ PVC
couplers already attached. Just insert a Barb x Spigot fitting or your favorite 
color of pipe into each fitting. The plate can be removed if necessary for a custom
plumbing option. 

 

**Self-Adjusting Platform **(pat pending)

After the refugium section water will flow over the patent-pending self-adjusting
platform. Just set the water level where you want it, and the baffle will automatically
set itself to the optimal location, maximizing space for media on the bottom plate.

 

**Probe Holder**

All RM30 sumps come with a probe holder that can hold up to four probes. The countersunk
holes accept almost all major brands of probes, even Neptune’s temperature probe.

 

**Dosing Tube Holder**

The RM30 sump comes standard with four push-connect adapters that can accept any
1/4″ OD tubing. They are great for connecting dosing pumps, ATO, and calcium reactor
effluent lines.

 

**Cable Organizers**

The little things are what matters and Trigger’s attention to detail also includes
cable organizer clamps that can hold tubing or electrical cables securely and out
of the way. 

 

**What’s Included?**

1x RM30 Sump

3x Foam Bulkhead Spacers

1x Rollermat Elevation Stand

 

**Note:** Theiling Rollermat not included and required for use. 

 

**Attaching the RM30 Sump to the Theiling Rollermat**

 

 1. Unscrew and remove the nut and gasket from the bulkheads included with the Rollermat
    assembly. 
 2. Remove the input (lower most) bulkhead completely from the Rollermat body and also
    remove the stub pipe from the input bulkhead.
 3. Remove the 4 thumb screws that retain the drain plate from the sump
 4. Place the Rollermat stand where the unit will be sitting. 
 5. Place one Spacer Gasket on each bulkhead and then slide the Rollermat assembly 
    into the holes on the side of the sump.
 6. Loosely attach the bulkheads gaskets and nuts to the bulkheads that protrude through
    the sump. 
 7. The input bulkhead needs to be placed from the sump side into the Rollermat which
    can be accomplished through the drain plate. Once it is through the sump and Rollermat
    you can then reattach the gasket, nut, and stub tube. 
 8. Snug all the bulkhead nuts but do not overtighten them.

 

**Note:** We highly suggest water testing any sump checking for leaks and function.
It is also important to check the water level in the sump during a simulated power
outage. It is possible for the water level in the Rollermat to rise up to the float
switch activating the motor and rolling through the fleece. If this happens we suggest
adding check valves to your return plumbing to help eliminate back siphoning. 

 

**Note:** Theiling Rollermat Sold Separately
